1. The Eleventh Bid Section Project of the Express Highway from Dandong to Benxi Liaoning Province
 
   The notification of bid award for the project was received on June 20 1999. The construction began on October 3 1999 and finished on September 26 2001. Its final settlement price is RMB 176,375,936. It is a two-way four-lane highway project, including the construction of 6.9 kilometers of road beds, 1426 meters of tunnels, 1294 meters of super-huge bridge as well as big bridge, middle bridge and other structures. This project covers a broad range of profession and has high technology content. Through on-the-spot examination by inspection administrations, all items of the project were appraised as good quality project.
   
   2. Pearlite Procession Turnkey Project of Henan Xinyang Yanghua Mineral Product Co. Ltd
 
    The Project is a cooperative joint venture project between China and Greece investors. The construction cost of the project is about RMB 40 million. Production facilities include oil storage tanks, storage houses, workshops, roads within the plant, bounding walls, boiler room, comprehensive pipe networks within the plant, office buildings and etc. 
     
  3. Ground Installation Item of Zambia Chambishi copper mine rehabilitation project
 
    The engineering site is located in City of Province, Zambia. This is a reconstruction project invested by the Chinese government. The authorization number of the project is No. (2000)411 of the Planning Committee. The Company is mainly in charge of ground installation of the project with a construction cost of US$ 3.36 million. The project was executed strictly according to ISO9002 international quality control standards and successfully passed the zero-load linkage trial run and commissioning trial for only one time.
     
   4. Installation Project of CCTV Cool-Supply Station Expansion
 
   The civil construction and equipment installation of the project began in October 1997 and finished in the spring of 1998. The ice storage groove of the project is located beneath the ground outside the cool-supply station. Its total volume is 485 cubic meters while ice storage amount is 6188RTH. Equipment used includes two sets of screw refrigerators, two sets of plate heat exchangers and two sets of coolers. Nonferrous Metal Institute designed the constructional drawing of the project while the Company installed the equipment. Up till now, the system has operated safely for five years.
   
  5. Installation Item of Centralized Air Condition and Domestic Hot-Water Supply System of Shanghai Zhongkai Project
 
   The project is located in the intersection point of Chengdu North Road and Weihai Road in Jingan District, Shanghai. It is an electric equipment installation project, which includes the installation of electric equipment of energy stations, electric automatization control equipment, housing air condition equipment, and indoor and outdoor pipes. The installation began on June 1 2003 and will finish in December 31 2004. The contract price is about RMB 15 million. The project is now progressing smoothly.

 

Address: The 10th Floor of China Nonferrous Construction Building,
No. 25, Lianhuachi Nanli, Fengtai District, Beijing
Postcode£º100055  Phone£º010£­63485790  Fax£º010£­63485791
Email:webmaster@nfcbj.com